A portion of Wabash Street is closed for sewer line repairs. Utility Director Jon Oman reported that the sanitary fix was not up to standard, and the manhole boot connectors were knocked out of alignment. Oman hopes that the line repairs will be finished soon, but ensured repairs on the line will be completed by the end of the week. A timeline for asphalt repairs has not yet been determined. (Photos by Jonathan Snyder)