Public Notice City of Bluffton  Preliminary Engineering  Report (PER) Addendum No. 1 The City of Bluffton is revising the Preliminary Engineering Report (PER) from an existing State Revolving Loan to include the following item: The existing storm pipe near Bell Brook Boulevard is failing and has caused sink holes. The City is planning to repair…

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here